The Ore Reserve and Mineral Resource estimates were compiled in accordance with The SAMREC Code, 2007. The Mineral Resources are reported as exclusive of those Mineral Resources modified to produce the Ore Reserve figures, i.e. the Ore Reserves are excluded from the Mineral Resource figures. In contrast, in 2007, Anglo American reported Mineral Resources for Kumba Iron Ore inclusive of Ore Reserves. The change to an exclusive reporting basis is in alignment with Anglo American’s reporting practice. These exclusive Mineral Resources are taken from the Kumba Iron Ore Annual Report of 2007.
The figures reported represent 100% of the Ore Reserves and Mineral Resources, the percentage attributable to Anglo American plc is stated separately. Rounding of figures may cause computational discrepancies.
| Iron Ore Ore Reserves |
Tonnes million |
Grade | Saleable product million tonnes |
|||||
|---|---|---|---|---|---|---|---|---|
| Attributable % | Classification | 2008 | 2007 | 2008 | 2007 | 2008 | 2007 | |
| Sishen Iron Ore Mine (OP)(1) | 36.6 | %Fe | %Fe | |||||
| Proved | 709.2 | 805.3 | 59.7 | 59.5 | 536@65.0% Fe | 598@65.2% Fe | ||
| Probable | 247.7 | 227.2 | 59.3 | 60.0 | 187@65.1% Fe | 174@65.3% Fe | ||
| Total | 956.9 | 1,032.5 | 59.6 | 59.6 | 723@65.0% Fe | 772@65.2% Fe | ||
| Thabazimbi Iron Ore Mine (OP) | 46.6 | %Fe | %Fe | |||||
| Proved | 4.1 | 7.8 | 64.5 | 62.9 | 4@64.9% Fe | 7@63.5% Fe | ||
| Probable | 0.8 | 1.5 | 64.9 | 62.7 | 1@65.1% Fe | 1@63.1% Fe | ||
| Total | 4.9 | 9.3 | 64.6 | 62.9 | 5@64.9% Fe | 8@63.4% Fe | ||
| Sishen South Iron Ore Project (OP)(2) | 46.6 | %Fe | %Fe | |||||
| Proved | 123.1 | 97.7 | 64.2 | 64.7 | 123@64.1% Fe | 97@64.7% Fe | ||
| Probable | 91.0 | 78.2 | 63.9 | 63.6 | 91@63.9% Fe | 78@63.6% Fe | ||
| Total | 214.1 | 175.9 | 64.1 | 64.2 | 214@64.0% Fe | 176@64.2% Fe | ||
| Iron Ore Mineral Resources |
Tonnes million |
Grade | ||||||
| Attributable % | Classification | 2008 | 2007 | 2008 | 2007 | |||
| Sishen Iron Ore Mine (OP) | 36.6 | %Fe | %Fe | |||||
| Within Pit | Measured | 44.8 | 31.2 | 59.5 | 60.7 | |||
| Indicated | 14.5 | 23.2 | 57.7 | 59.7 | ||||
| Measured and Indicated | 59.3 | 54.5 | 59.1 | 60.3 | ||||
| Inferred in Mine Plan | 4.2 | 4.9 | 61.8 | 62.4 | ||||
| Outside Pit(3) | Measured | 713.9 | 617.8 | 54.6 | 55.2 | |||
| Indicated | 701.0 | 588.5 | 57.4 | 58.6 | ||||
| Measured and Indicated | 1,414.8 | 1,206.3 | 56.0 | 56.9 | ||||
| Inferred | 146.6 | 109.7 | 59.4 | 61.0 | ||||
| Thabazimbi Iron Ore Mine (OP) | 46.6 | %Fe | %Fe | |||||
| Within Pit | Measured | 0.7 | 0.5 | 61.0 | 62.3 | |||
| Indicated | 0.0 | 0.1 | 61.8 | 61.6 | ||||
| Measured and Indicated | 0.7 | 0.5 | 61.0 | 62.2 | ||||
| Inferred in Mine Plan | 0.3 | 0.3 | 61.8 | 61.6 | ||||
| Outside Pit | Measured | 18.0 | 18.1 | 62.4 | 62.4 | |||
| Indicated | 4.8 | 4.9 | 63.4 | 63.4 | ||||
| Measured and Indicated | 22.9 | 23.0 | 62.6 | 62.6 | ||||
| Inferred | 2.6 | 2.7 | 63.5 | 63.4 | ||||
| Sishen South Iron Ore Project (OP) | 46.6 | %Fe | %Fe | |||||
| Within Pit(4) | Measured | 0.9 | – | 61.1 | – | |||
| Indicated | 0.8 | – | 61.6 | – | ||||
| Measured and Indicated | 1.7 | – | 61.3 | – | ||||
| Inferred in Mine Plan | 35.4 | – | 65.5 | – | ||||
| Outside Pit | Measured | 48.6 | 31.3 | 65.1 | 65.6 | |||
| Indicated | 20.0 | 55.6 | 65.0 | 64.3 | ||||
| Measured and Indicated | 68.6 | 86.8 | 65.1 | 64.8 | ||||
| Inferred | 47.1 | 10.1 | 62.5 | 63.4 | ||||